<style id="3tdvx"></style>

  1. <td id="3tdvx"><tr id="3tdvx"></tr></td>
    Welcome to the official website of Nanchong Lefuer Industry & Trade Co., Ltd.!National Service Hotline:13858928298
    Products
    Sitemap:Home ? Products ? Pre-treatment line (cleaning,...

    Product name:QXJ16-34M-1.2M-280C Flat mesh pre-processing pipeline

    Contact: Mr. Xu

    Phone:13858928298

    Email: ykxiongliang@163.com

    Address: No. 208, Airport Road, Gaoping District, Nanchong City, Sichuan Province

    Notice for use

    浙江·永康市樂(lè)福爾涂裝設(shè)備有限公司

    Zhejiang ·Yongkang Lefuer coating equipment Co., LTD

    四川·南充市樂(lè)福爾工貿(mào)有限公司

    Sichuan·Nanchong Lefuer industry and trade Co., LTD

    A區(qū)地址:浙江省永康市(李店)城西利康創(chuàng)業(yè)園8號(hào)        Http/www.yklefuer.cn

     

    TEL:0579—87255386    FAX:0579—87255376       Email:ykxiongliang@126.com

    District A address: no. 8, likang pioneer parkthe the west of Yongkang , zhejiang province

     

    B區(qū)地址:四川省南充市高坪區(qū)機(jī)場(chǎng)路208號(hào)                Http/www.nuying001.com

     TEL:0817—3310288     FAX:0817—3350123         Email:ykxiongliang@163.com

     

    District B address: 208 jichang road, gaoping district, Nanchong , sichuan province

                                                                                                      

     

    中高端涂裝設(shè)備制造商

    中國(guó)表面處理協(xié)會(huì)涂裝分會(huì)會(huì)員單位

    中表協(xié)涂裝證字第0300號(hào)

    (中國(guó)表面處理行業(yè)評(píng)選)

    第四屆涂裝十佳風(fēng)云人物獲獎(jiǎng)單位

    第五屆涂裝十佳銳進(jìn)企業(yè)獲獎(jiǎng)單位

    第六屆十佳涂裝民族品牌獲獎(jiǎng)單位

    第七屆最有影響力十佳涂裝供應(yīng)商獲獎(jiǎng)單位

    第八屆最有影響力十佳涂裝供應(yīng)商獲獎(jiǎng)單位

    第九屆2014年度十佳涂裝設(shè)備品牌獲獎(jiǎng)單位

    2015華彩獎(jiǎng)-涂裝設(shè)備影響力品牌

     

    Middle and high-end coating equipment manufacturers

    Member of coating branch of China surface treatment association

    Zhongbiao association coating license no. 0300

    (selected by China surface treatment industry)

    The fourth painting top ten award winning units

    The fifth coating ten best enterprises to forge ahead award units

    The sixth ten best national brand coating award unit

    The seventh most influential ten best coating supplier award unit

    The eighth most influential ten best coating supplier award unit

    The ninth 2014 annual top ten coating equipment brand award unit

    2015 huacai award - influential brand of painting equipment

     設(shè)計(jì)方案

     

            工程名稱: QXJ16-34M-1.2M-280C平面網(wǎng)帶式前處理流水線工程

    技術(shù)設(shè)計(jì)參數(shù)

     

    Design scheme

     

    Project name: QXJ16-34M-1.2M-280C plane net belt pretreatment pipeline project

    Technical design parameters

     

     

     

    QXJ16-34M-1.2M-280C plane net belt pre-treatment pipeline project

    Technical design parameters

     

     

    一、Project nameQXJ16-34M-1.2M-200C degreasing phosphating pretreatment and drying line

     Project contents

    The whole line is composed of pre-treatment, moisture drying furnace, conveying system, drying pipeline and electric control system of related equipment.

    All the above projects are "turnkey" projects for design, manufacture, installation, commissioning and technical services including personnel training, and cooperate with users accordingly.

    3. Design ideas

    According to the requirements of the customers and the conditions provided, we make full use of our advanced technology and technology, carefully select the famous and excellent accessories at home and abroad, so that the production line ranks the advanced level in the same industry in China.

    . Design basis

    1. Name of workpiece: iron drawing pan, cake mold, etc.

    Material: cold plate A3,

    2. Production program: 1200 pieces/hour

    3. Workpiece properties:

    (1) workpiece size: M200×L300*H200mm (full size)

    (2) workpiece quality: ≤5kg

    (3) the optimal design speed is 1.6m/min

    (4) external dimension: 34000L×1550W+500w×1500H (mm)

    4. Transportation mode:

    Plane type 212AL stainless steel 304 steel wire industrial mesh belt

    5. Heating energy: 10G of natural gas

    Degreasing sink: heat with professional 18kw

     

     

    V. process plan design (standard)

    1, an iron process: on a - skimmed (heating 40 ℃ to 50), e.g. degreasing 40 ℃ to 50 (heating) - drop (wiper), automatic water, water, rinse water (using the most environmentally friendly water before filling function) - drop (wiper) - watch - drop (wiper) area, surface chemical treatment (phosphate) - automatic water - water (wiper) area - water - filling water wash (with the most environmentally friendly water before filling function), automatic water, under the hot water - adjustable blowing wind curtain - bake, drying - the piece

    2. Process speed:

    Pretreatment pipeline: V = 1.6m/min(0-2.0m/min adjustable)

    3. Process parameters:

    (1) upper part :(manual) ≥1 meter

    (2) pretreatment: 23000L×1600W×1500H (mm)

       

    section

    handling

    溫度(℃)

    時(shí)間(sec)

    區(qū)長(zhǎng)(m

    In a district



    50

    0.8

    Pre skim

    spray

    40-50

    60

    4.5

    skim

    spray

    40-50

    60

    Automatic water




    Hot water washing

    spray

    40-50

    60

    4.0

    Cold water to wash

    spray

    homoeothermy

    60

    Waterlogging caused by excessive rainfall




    Automatic water

    spray

    80

    60

    3.0

    watch




    Waterlogging caused by excessive rainfall

    spray

    30

    240

    6

    Automatic water




    Surface chemistry (phosphating)

    spray

    homoeothermy

    60

    4.2

    To deal with

    spray

    homoeothermy

    60

    Automatic water

    handling



    Water washing




    9

    Filling water to wash

    spray



    Automatic water

    spray



    Automatic water




    2.5

    The wind knife

    spray



    34

     

     

    Dehydration drying oven:

          A, Dimensions: 8000L × 1600W × 1500H (excluding the height of the fan pipe)

          B, drying temperature: 0 ° C -200 ° C (adjustable)

          C, drying time: ≥ 5 minutes

          D, the temperature difference inside the furnace: ± 8 ° C

          F, heating energy consumption: 10G natural gas circulating air volume: 10G natural gas

          G, total installed power: drying tunnel 10G natural gas + skim 18KW

          H, heating time: ≤ 35 minutes

          J, noise: ≤75 decibels

        (4) Delivery system:

          A. Conveyor belt: 212AL-1.3m-12-3.0-2.5 stainless steel chain rod type large hole mesh belt

          B, lotus rod mesh belt pitch: 152mm

          C, drive motor power 1.5KW/380 160:1 imported Japanese GTR connected body gear motor

          D, running speed: 0-2.0m/min (frequency control)

     

     

     

     

     

     

    4、 process plan layout (see floor plan)

          Total length: about 34M

    5、 5. Energy parameters and requirements:

    kind:

    name:

     

    Electricity(KW)

    Compressed air(㎡/min)

    Tap water(T/h

    Pretreatment pump

    19


    0.5

    Water heating

    18



    Drying tunnel heating

    10G natural gas



    Automatic pouring

    1



    Air knife

    6



    Moisture drying oven

    2.2



    Hot air circulation

    1.5



    Send mesh belt

    48


    0.5

     

    Equipment pipeline energy configuration: tap water supervisor: DN50 pressure 0.05-0.1Mpa

    Power supply: three-phase four-wire system 380V ± 10 50Hz 48KW

     

    Main materials and configurations

    Pre-treatment spray section foot bracket

    45mm*75mm*1.5 mm stainless steel square

    SUS201

    Pretreatment spray section body

    1.2mm stainless steel, sheet metal

    SUS304

    Pretreatment spray tank

    1.5mm stainless steel, sheet metal

    SUS304

    Pretreatment spray section track

    2.5mm stainless steel, sheet metal (upper and lower)

    SUS304, 201

    Conveyor belt

    1200-12-3-2.5 stainless steel industrial mesh with wire

    SUS304

    Automatic water pouring motor

    200W/380V, 40:1 variable speed motor

    Japan imported GTR

    Automatic pouring adjustment screw

    M30*490mm 45# screw

    45# (outerwear)

    Hot air curtain

    2.2KW/380V -2-4.0A

    Y100L-2

    Pretreatment air curtain duct

    80*3 steel wire hose

    Steel hose

    Pre-degreasing

    YLX650-80 3.7KW

    Professional submerged coating pump (Taiwan Resources)

    Degreasing

    YLX650-80 3.7KW

    Professional submerged coating pump

    Hot water wash

    YLX350-50 1.5KW

    (Taiwan Resources)

    Washed

    YLX350-50 1.5KW

    Professional submerged coating pump

    Tune

    YLX350-50 1.5KW

    (Taiwan Resources)

    Phosphating 1

    YHL 650-80 3.7KW

    Professional submerged coating pump

    Phosphating 2

    YHL 650-80 3.7KW

    (Taiwan Resources)

    Washed

    YLX350-50 1.5KW

    Professional submerged coating pump

    Deionized water wash

    YLX350-50 1.5KW

    (Taiwan Resources)

    Pump fittings

    Use PPR or stainless steel tube

    Professional submerged coating pump

    Water pipe spray pipe fittings

    (Highly equipped with all stainless steel tubes)

    (Taiwan Resources)

    Spray nozzle

    Use PPR or stainless steel tube stainless steel tube

    Professional submerged coating pump

    Quick door

    (Highly equipped with all stainless steel tubes)

    (Taiwan Resources)

    Filter blue

    Snap type PPR6525-32mm-14

    Professional submerged coating pump

    Drying (drying) shell

    1.2mm stainless steel, sheet metal

    (Taiwan Resources)

    Drying (drying) liner

    1.2mm-2mm stainless steel punching


    Drying insulation

    1.2MM cold rolled sheet metal

    Professional submerged coating pump

    Strong convection

    0.8MM stainless steel

    (Taiwan Resources)

    Drying tunnel import and export

    150-200mm asbestos

    Stainless steel 304

    Fan freezing

    2.2KW/400V -4-4.5A

    Stainless steel 304

    Drying conveyor belt drive

    Handwheel adjustment mechanical door

    Corrosion resistant

    Conveyor belt speed

    Axial Fan

    Stainless steel 304

    Electric control cabinet

    1.5KW/400 160:1 Japanese GTR

    Stainless steel 304

    Circuit arrangement

    Frequency control 1.5KW/400, 0-1.5M

    Carbon steel spray paint

    heating

    Japanese electrical installation

    Stainless steel 304

    Track guard

    Cable trough routing

    asbestos

    Degreasing sedimentation tank

    natural gas


     

    Process plan structure description

    1. Pre-treatment spray equipment:

    The line uses a flat pass automatic spray process.

        (1) Dimensions: 20500L × 1600W × 1500H (mm)

        (2) Structure setting:

    A: The spray tunnel runs through all the pre-treatment stations. The wall panel adopts the edging structure of &1.2mm SUS304 stainless steel plate. The seam is protected by a retaining process, which eliminates the need for through-welding, so that the surface is smooth and smooth, and there is no through-welding. Deformation occurs. Designed with an observable quick-repair door every 500mm for quick removal of the spray bar and nozzle to be cleaned

    There are water-blocking plates on both sides of each station section, and the water-stopping plates of adjacent stations are transitional sections. The bottoms of each transition section are sloped to facilitate the self-returning of the spray liquid, and the transition section is designed with adjustable anti-sputum liquid. The air curtain avoids mutual enthalpy of different liquids in adjacent stations.

    The integrated sink design has a filter basket in each sink to ensure long nozzle cleaning and quick and easy cleaning.

    In order to prevent water vapor from overflowing, an exhaust vent is provided at the top of the degreasing and phosphating section to prevent steam from overflowing into the workshop.

    B, liquid storage tank:

    All the inner plates of the troughs are made of stainless steel plates. All the welds in the troughs are sealed by a pass-welding process to prevent liquid leakage. The upper part of the trough body is provided with an overflow port and a water supply port. The bottom plate of the trough is a slope structure with the lowest bottom. There is a discharge pipe at the place to facilitate production and cleaning.

    A stainless steel filter basket (30-60 mesh) is installed in the tank to prevent foreign matter from being sucked into the pump body. Between degreasing, phosphating and water washing, a countercurrent complementary process is employed to prevent stringing of the respective tank solutions. During the manufacturing and installation process, the appearance should be smooth, smooth, beautiful without serious scratches, no leakage welding, no liquid leakage.

    C, sprinkler:

    It is mainly composed of spray pump, spray pipe, nozzle, valve, etc. The principle is that the spray pump of each station inputs the tank liquid into the spray pipeline, and sprays the workpiece through various nozzles. The valves in the valve are used to regulate the pressure and flow of the pump to meet the requirements of the pretreatment process.

    Each station spray pump uses a new type of pipeline centrifugal pump. The distance between the spray pipes is 120mm, and the water supply mode of the spray pipe is upward, which is convenient for pipe installation.

    The nozzle is made of polypropylene quick-disconnecting universal ball head nozzle PPR6520, and the upper nozzle is about 250mm away from the workpiece.

    In the production process, the pipeline is smooth, there is no leakage at the joint, and the bend of the pipeline is connected by elbows. The overall route is beautiful, neat, and easy to disassemble and maintain.

    The phosphating tank is made of stainless steel and has a volume of about 2000*1950*H500MM. It is suitable for cleaning this equipment.

     

    2, drying the drying tunnel:

    The main body of the drying tunnel adopts the profile skeleton, which is directly connected to the tunnel type thermal insulation structure. The inner Mongolian panel is made of &0.8mm stainless steel, and the outer Mongolian panel is selected (with &150mm rock wool insulation layer) 1.2mm cold plate sheet metal. The overall structure is scientific and reasonable, and the outer wall of the drying tunnel is average. The temperature is not higher than the ambient temperature of 6 °C.

    The manufacturing and installation appearance is smooth and beautiful.

       (2) Hot air circulation system:

    It consists of an electric heater and a hot air circulation device.

    The inner wall of the hot blast stove is made of &1.2mm stainless steel. The electric heater is made of stainless steel, and the hot air circulation device is composed of a centrifugal fan, a supply air duct and a return air outlet. The centrifugal fan is a 4-72 air-cooled heat-resistant circulating fan, and the air duct is made of &0.7mm stainless steel plate.

    The hot air circulation mode of the hot blast stove is the upper suction and the air supply type.

    The temperature in the furnace is controlled by a single point.

       (3) Exhaust device and hot air forming device:

    There is a set of natural exhaust gas discharge device at the top of the furnace body, which is used for timely discharging the steam volatilized and evaporated, and the air duct is made of &0.8mm galvanized sheet. The waste hot air is pressed by the high pressure blower and used to blow dry. Workpieces. This can greatly improve the efficiency of drying and save energy.

       (4) Delivery system:

            The system consists of motor power 1.5KW/380 160:1 imported from Japan GTR connected gear motor, phosphating conveyor belt, synchronous bridge system, drying conveyor belt, and so on. When baked by the process furnace, the operation is stable, safe and reliable, and there is no jitter.

     3. Electronic control part:

       (1) The whole line of electronic control is a combined control of multiple cabinets, which is easy to operate.

       (2) Its function is to control equipment such as pre-treatment equipment, moisture drying furnace and conveying system. The control cabinet is also equipped with electric heater and fan interlock double protection circuit breaker, overload protection, temperature control instrument furnace temperature automatic control system, and emergency stop switch on the upper and lower parts of the workpiece, which has the characteristics of simple operation and convenient maintenance.

      (3) The primary power distribution is the responsibility of the user (the power transmission from the workshop power distribution cabinet to the equipment electrical control cabinet), and the secondary power distribution is the responsibility of us (both the equipment electrical control cabinet to the equipment), and the wiring is the bridge. Trace, branch pipe type.


    精品九九,国产日韩视频在线观看,2020日韩无码中文字幕,亚洲精品在线观看按摩不卡 亚洲v日韩v精品v下载 亚洲国产小电影在线观看高清
    <style id="3tdvx"></style>

    1. <td id="3tdvx"><tr id="3tdvx"></tr></td>